Castelnau Underground: Difference between revisions

Hinwapoon (talk | contribs)
m 1 revision imported
mNo edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[Category:Gardellia]]
[[Category:Gardellia]]
[[Category:Gardellia Railways]]
{{infobox
{{infobox
| headerstyle = background:#FFFF00;
| headerstyle = background:#FFFF00;
Line 20: Line 21:
On the 31/10/17 the fill in station along the line opened as Castelnau Arena station.
On the 31/10/17 the fill in station along the line opened as Castelnau Arena station.


In March 2020, Castelnau Underground tunnels were renovated, with curves and gradients redone. The first section to receive this was Paillade Nord to Maguelones.
In March 2020, Castelnau Underground tunnels were renovated, with curves and gradients redone. The first section to receive this was Paillade Nord to Maguelones. In 2021, it was decided to upgrade the line further to have longer trains for a light metro based service. Castelnau Arena and Paillade Nord stations underwent extensive renovations. While Beach station was planned for closure, this would be executed once a new Seaside Central (to be renamed Seaside Crescent) is built. In the future, the line will be extended to New Hudson.


== Stations ==
== Stations ==
Line 59: Line 60:
== Service Pattern ==  
== Service Pattern ==  


20tph peak hours Mon-Fri 6tph continue to Hyeres
16tph peak hours Mon-Fri 4tph continue to Hyeres


10tph off peak Mon-Fri 5tph continue to Hyeres
10tph off peak Mon-Fri 3tph continue to Hyeres


10tph Sat 5tph continue to Hyeres
10tph Sat 3tph continue to Hyeres


8tph Sun 4tph continue to Hyeres
8tph Sun 2-3tph continue to Hyeres


6tph Late Night 3tph continue to Hyeres
6tph Late Night 2tph continue to Hyeres