ConnectCentral: Difference between revisions
→Line D extension and connection: moving content to the Line D article |
→History: add more |
||
| Line 25: | Line 25: | ||
Line D opened in two separate regions due to the complexity of connections to be done. These sections were Paillade to Maguelones in Castelnau Le Lez and Aberdeen to Central in Palm Ridge. The latter was extended to North New Oak in 2020. This line had served the Canal section until 2020 when Line A took over. | Line D opened in two separate regions due to the complexity of connections to be done. These sections were Paillade to Maguelones in Castelnau Le Lez and Aberdeen to Central in Palm Ridge. The latter was extended to North New Oak in 2020. This line had served the Canal section until 2020 when Line A took over. | ||
=== Line A Improvement works === | |||
Over the years, Line A has received multiple track improvement works. The curves around Dalesburg City Hall were redone when platform extension works occurred. As existing tunnels leading to Maguelones from Castelnau Arena were too sharp, a new route was done to allow for longer trains to operate. This renovation was completed in 2019, utilising a month-long closure. When the underground road tunnel was redone, a new route was needed between north of the new Maguelones portal and west of Dalesburg City Hall. A new gentle curve was done from the latter, with a new cut-and-cover tunnel dug. The line now has a road crossing due to space constraints. These works were completed in May 2021. Castelnau Arena would open at a later date due to extensive renovation involving the Castelnau Underground station. | |||
=== Separation and Realignment of Lines A and B, Extension to Central City === | === Separation and Realignment of Lines A and B, Extension to Central City === | ||
Revision as of 08:08, 10 June 2021
| ConnectCentral | |
|---|---|
| Error creating thumbnail: Unable to save thumbnail to destination | |
| Public Transport System | |
| Operators: | Connect and Dalesburg Department of Transportation |
| Lines: | 4, previously 5 (A B D E, formerly C) |
| Number of Stations: | 23 (previously 28) |
| Parent Company | Matt Transit and Dalesburg Department of Transportation |
| System Map | |
|
| |
The ConnectCentral network is a five-line tramway system in the cities of Castelnau Le Lez, Gospley, Palm Ridge, Dalesburg and Rockham located in the Central Region of Gardellia. The tramway is owned by the five cities' transport agencies, and is also operated by all five of their transport agencies.
History
ConnectCentral is a rebranding of the Dalesburg Tram lines that extended into Castelnau Le Lez. A line was later extended into Rockham.
Over the years, lots of improvements were done including platform extensions and frequency improvements. Due to the regeneration of Rockham, Line C was permanently closed. Line A lost its branch to Residential due to low usage. Its replacement station is ConnectCentral Arena.
Line D opened in two separate regions due to the complexity of connections to be done. These sections were Paillade to Maguelones in Castelnau Le Lez and Aberdeen to Central in Palm Ridge. The latter was extended to North New Oak in 2020. This line had served the Canal section until 2020 when Line A took over.
Line A Improvement works
Over the years, Line A has received multiple track improvement works. The curves around Dalesburg City Hall were redone when platform extension works occurred. As existing tunnels leading to Maguelones from Castelnau Arena were too sharp, a new route was done to allow for longer trains to operate. This renovation was completed in 2019, utilising a month-long closure. When the underground road tunnel was redone, a new route was needed between north of the new Maguelones portal and west of Dalesburg City Hall. A new gentle curve was done from the latter, with a new cut-and-cover tunnel dug. The line now has a road crossing due to space constraints. These works were completed in May 2021. Castelnau Arena would open at a later date due to extensive renovation involving the Castelnau Underground station.
Separation and Realignment of Lines A and B, Extension to Central City
Due to overcrowding, ConnectCentral considered several solutions to mitigate this issue. To increase capacity, Line B would be separated entirely from Line A, with direct tunnels to reach Paillade Stadium. Whilst this was done, Line A was realigned between Maguelones and Canal to enable the project to revitalise Castelnau Canal be delivered. Agropolis tramstop was permanently closed, and Canal tramstop was relocated slightly to the east. This location would be connected to the Line B tramstop.
Line B would take an alternative route to Canal, via Paillade, providing interchange to Tram Line D. Current works progressed up to Paillade, which was completed in 2020. New tunnels were dug to Canal in May 2021, expected to open in July. On the other end, Dalesburg Mainline station ceased to be the terminus when the line was extended to Dalesburg Athlete Village.
These lines are expected to be extended to Central City. Tentative dates are not set, but the alignments were finalised in 2020. Line B would continue from Canal to the Port of Gardellia, while Line A would continue from LeCity2 into the Central City, with an intersection with Line B at the western end. Preliminary works were done on Line A, which saw the total reconstruction of Super Speedway station and the short extension to LeCity2. Allentown station was relocated, with Dalesburg City Hall rebuilt to accommodate longer platforms and an additional pair for Line B. With several weekend closures, these works were completed in 2020.
Lines
A Red Line
Castelnau Le Lez - Canal
Castelnau Le Lez - Maguelones
Castelnau Le Lez - Castelnau Arena [CLOSED Temporarily]
Dalesburg - City Hall
Dalesburg - Allentown
Dalesburg - ConnectCentral Arena [Future - Selective Door Operation]
Dalesburg - Super Speedway [Dalesburg - Residential] CLOSED
Gardellia Central City - LeCity2
Future:
Gardellia Central City - ?
Gardellia Central City - ?
Up to every 2.5 minutes during the day.
B Orange Line
Castelnau Le Lez - Canal
Castelnau Le Lez - Paillade
Dalesburg - City Hall
Dalesburg - Train Station
Dalesburg - Ocean Key
Dalesburg - Athlete Village West
Up to every 4 minutes during the day.
C Green Line
Dalesburg - Residential
Rockham - East Beach
Rockham - Central
Rockham - Southpoint
Rockham - Stadium Way
Up to every 7.5 minutes during the day. *Line closed permanently
D Cyan Line For more information and history see Matt Transit Castelnau Le Lez - Palm Ridge Line
Castelnau Le Lez - Maguelones
Castelnau Le Lez - Luynes
Castelnau Le Lez - Beaulieu
Castelnau Le Lez - Paillade
Castelnau Le Lez - Stadium [Shelved]
Gospley - Gospley Central
Gospley - Bridesgate
Up to every 3 minutes during the day.
E Dark Blue Line
Palm Ridge - Mainline
Palm Ridge - Central
Palm Ridge - Temple-Arena OR Palm Ridge - Stadium
Palm Ridge - Connor
Palm Ridge - Plainsview
Up to every 7.5 minutes during the day. Service will be boosted once the line is extended to Ember Coast with a 3+1 service pattern (3 trains for Ember Coast for every 1 train to Stadium)
Trivia
Tram Line A serves 3 stadiums, the ConnectCentral Arena, Paillade Stadium and Castelnau Arena.
Service Notifications
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||