Intercity Line 1 (Gardellia Mainlines): Difference between revisions

Rolling Stock: add info
Line 66: Line 66:
Due to the abandonment and move on Sint Maartenstaad, the section between there and Abaki was suspended for months since December 2019, before being announced its permanent closure. This resulted in an alternative alignment of an extension to serve New Brighton, a new developing town in the extreme west of Gardellia. An intermediate station was planned, which is now occupied by Delmarva City. Line works were done in June 2019, resulting in suspension of the line between Abaki and Lakeview which would utilise the new crossover built. Due to complex terrain involving swamps, construction was delayed. Abaki was reopened in July 2019. On the 14th of September, the line finally reached its ultimate terminus at New Brighton. Delmarva City opened much later in 2020.
Due to the abandonment and move on Sint Maartenstaad, the section between there and Abaki was suspended for months since December 2019, before being announced its permanent closure. This resulted in an alternative alignment of an extension to serve New Brighton, a new developing town in the extreme west of Gardellia. An intermediate station was planned, which is now occupied by Delmarva City. Line works were done in June 2019, resulting in suspension of the line between Abaki and Lakeview which would utilise the new crossover built. Due to complex terrain involving swamps, construction was delayed. Abaki was reopened in July 2019. On the 14th of September, the line finally reached its ultimate terminus at New Brighton. Delmarva City opened much later in 2020.


=== Nationalisation ===
=== Nationalisation and Infrastructural Improvements ===
In preparation for nationalisation, several drastic improvements were done to improve the line. Notably, the curve and gradient between Schitt's Creek and Council had been redone thrice, with the most recent being May 2021. bad fischdorf which included a new platform and a new concourse
 
On 8 June 2020, the [[Ministry for Infrastructure and National Development]] purchased the line for $60,000 from the North Western Gardellia Alliance. The line will also be integrated into the mainline network in the future after extensive renovations.
On 8 June 2020, the [[Ministry for Infrastructure and National Development]] purchased the line for $60,000 from the North Western Gardellia Alliance. The line will also be integrated into the mainline network in the future after extensive renovations.


Several gradient improvements are planned, with the steepest one at Crystal Hills redone in 2020.
Several gradient improvements are planned, with the steepest one at Crystal Hills redone in 2020.


== Rolling Stock ==
== Rolling Stock and Rail Infrastructure ==
The line previously used M5LSA as its first train type. After extensive renovation in June 2018, new rolling stock was introduced, named M7LSA.
The line previously used M5LSA as its first train type. After extensive renovation in June 2018, new rolling stock was introduced, named M7LSA. This series is named based on the convention of M for Minecart,  7 denoting the number of carts attached and LSA meaning Line Semi-Automatic. When line infrastructure improvements were done extensively 2019, this allowed for longer trains which would aid in reducing overcrowding at major stations such as Council, Abaki and Schitt's Creek. Different lengths of train sets were introduced in phases. A slightly longer train, the M15LSA, was introduced in September 2019.
 
By October, most of the M7LSA were retired. A new series, the POF25SDA, was introduced. P for Pixelixel, O for Oscar, and F for Fukuya Downtown, the special termini. SDA denotes Semi-automatic and selective door operation. Due to short platforms at Fukuya Downtown, the M7LSA remained in service until the station had platform extension works done. This also suggested that long trains terminated at Bad Fischdorf. However, the shorter eastbound platform would introduce selective door operation for the first time on the line. Work to extend these platforms began in December 2019, in conjunction with track improvement works at Bad Fischdorf. Services were part suspended between Council and Fukuya Downtown until 11 March 2020 when Fukuya Downtown reopened with selective door operation implemented. Majority of the fleet is now POF25SDA, with special reliever M15LSA trains.
 
There are two depots built for IC-1, in New Brighton and Linirea. The latter is currently deemed too tight for trains to manouvre, which has been taken out of use. The depot at New Brighton has been rebuilt several times. Crossovers are available on the line at Abaki, Lakeview, Schitt's Creek and Fukuya Downtown.


== Stations ==
== Stations ==