World Tech Industries: Difference between revisions
No edit summary |
|||
| Line 23: | Line 23: | ||
However, it was shut down by the owner of UKRail soon because of ruining spawn's scenery, and part of the rail was actually found not legit. | However, it was shut down by the owner of UKRail soon because of ruining spawn's scenery, and part of the rail was actually found not legit. | ||
[[File:NH Rail Network.png|thumb|New Hollow rail nework map consists UKRail and serveral other operators.]] | |||
In 2017, UKRail invested an airport express line plan from the server owner SilverWolv. _AngelKevin_ was in help of this project but Gukky actually designed most of it's route. The project was finished in July 2017, called the [[Metro_Line_10]], operated by UKRail until now. | In 2017, UKRail invested an airport express line plan from the server owner SilverWolv. _AngelKevin_ was in help of this project but Gukky actually designed most of it's route. The project was finished in July 2017, called the [[Metro_Line_10]], operated by UKRail until now. | ||