Matt Transit Castelnau Le Lez - Palm Ridge Line

Revision as of 15:48, 8 June 2021 by VincentLUMCFan (talk | contribs) (Stations: update)
Castelnau Le Lez - Palm Ridge Line
Line Overview
Operator(s) Matt Transit under the Connect brand
Line Length ?
Runs Through Castelnau Le Lez, Gospley, Palm Ridge

The line officially started construction on the 14/1/17. It acts as a local street level service to the Blue Gardellia Mainline between Castelnau Le Lez and Palm Ridge. It is commercially called Connect1

The line opened on 8/3/17 between Maguelones and Beaulieu, the official inauguration of phase 1 and 1A took place on the 11th. Phase 1B was opened and inaugurated on the 12/3/17.

Stations

Not All are marked yet

Status Code Name Connections
  Maguelones Gardellia Northwest/Central Peninsula/Northeast Mainline
  Luynes
  Beaulieu
  Paillade
  Gospley Central (closed) Gardellia Northwest/Central Peninsula Mainline
  Gospley Bridesgate (closed)
  Future Fill In Station (closed)
  Aberdeen
  Palm Ridge Central Bus 11 to Ferries
  New Oak
  North New Oak

NOTE: Line operated in 2 separate parts.

Phases

Phase 1: Maguelones Luynes Beaulieu

Phase 1A: Palm Ridge Central Aberdeen

Phase 1B: Expo Canal

Phase Agropolis: Addition of Campus Agropolis Station, subsequently merged with phase 1B. Hence the narrow island platform.

Phase 1 Extension: Paillade Station. The station was opened due to the construction of the Halles de La Paillade (shopping mall) nearby.