Matt Transit Castelnau Le Lez - Palm Ridge Line
| Castelnau Le Lez - Palm Ridge Line | |
|---|---|
| Line Overview | |
| Operator(s) | Matt Transit under the Connect brand |
| Line Length | ? |
| Runs Through | Castelnau Le Lez, Gospley, Palm Ridge |
The line officially started construction on the 14/1/17. It acts as a local street level service to the Blue Gardellia Mainline between Castelnau Le Lez and Palm Ridge. It is commercially called Connect1
The line opened on 8/3/17 between Maguelones and Beaulieu, the official inauguration of phase 1 and 1A took place on the 11th. Phase 1B was opened and inaugurated on the 12/3/17.
Stations
Not All are marked yet
| Status | Code | Name | Connections |
|---|---|---|---|
| Maguelones | Gardellia Northwest/Central Peninsula/Northeast Mainline | ||
| Luynes | |||
| Beaulieu | |||
| Paillade | |||
| Gospley Central (closed) | Gardellia Northwest/Central Peninsula Mainline | ||
| Gospley Bridesgate (closed) | |||
| Future Fill In Station (closed) | |||
| Aberdeen | |||
| Palm Ridge Central | Bus 11 to Ferries | ||
| New Oak | |||
| North New Oak |
NOTE: Line operated in 2 separate parts.
Phases
Phase 1: Maguelones Luynes Beaulieu
Phase 1A: Palm Ridge Central Aberdeen
Phase 1B: Expo Canal
Phase Agropolis: Addition of Campus Agropolis Station, subsequently merged with phase 1B. Hence the narrow island platform.
Phase 1 Extension: Paillade Station. The station was opened due to the construction of the Halles de La Paillade (shopping mall) nearby.