Tram Line 3 (4th Haven)

From WolvHaven Wiki
Revision as of 08:54, 8 April 2022 by MatthieuTofu (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
This article is under Construction.

It may be unfinished. You can help by editing this page. When this page is sufficiently long, Remove this template.

WolvHaven Tram Line 3

Sarglia Tram Stop
Overview
Type Light rail/tram
System WolvHaven Tram
Status Operational
Termini Stalingrad Coast
Parkroyal
Stations 9 (Operational)
Services 1
Overview
Opened 21st April 2016; 3 years ago
Operator(s) RegioLinQ
Character At-grade (Stalingrad Coast - SOHO North)
Underground (SOHO North - Parkroyal)
Depot(s) 6th Road Depot
Rolling stock SWT05AM/A
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 750 V DC ground-level power supply (APS)
Operating speed limit of 30km/h (18.64 mph)
Route Map