Woo Metro Line 4

Revision as of 12:23, 28 April 2021 by Hinwapoon (talk | contribs) (1 revision imported)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Woo Metro Line 4
Error creating thumbnail: Unable to save thumbnail to destination
Line Overview
Operator Woo Metro
Stations 5
Depot Woo Transport Centre Depot
Specifications
Rolling Stock TBD


Woo City Metro Line 4 is the 2nd metro line to start construction in Woo City. Starting at Woo Transport Center the line stops at Rail Depot, Woo City Mainline, TBA and St Leonstad. This will be the first Woo Metro line to share metro lines with another claim.

Stations

Name Picture Platforms Opening Date Notes
Woo Transport Center Coming Soon 3 Not Open None
Rail Depot Coming Soon 2 Not Open None
Woo City Mainline Coming Soon 10 Not Open None
TBA Coming Soon 4 Not Open None
St Leonstad Mainline Coming Soon 4 Not Open Givern perm to build to another claim on 28/05/2020.