Matt Transit Castelnau Le Lez - Palm Ridge Line

From WolvHaven Wiki
Revision as of 09:22, 10 March 2020 by Wolvhaven(Shoutwiki)>Chickenjoshbwak
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Castelnau Le Lez - Palm Ridge Line
Line Overview
Operator(s) Matt Transit under the Connect brand
Line Length ?
Runs Through Castelnau Le Lez, Gospley, Palm Ridge

The line officially started construction on the 14/1/17. It acts as a local street level service to the Blue Gardellia Mainline between Castelnau Le Lez and Palm Ridge. It is commercially called Connect1

The line opened on 8/3/17 between Maguelones and Beaulieu, the official inauguration of phase 1 and 1A took place on the 11th. Phase 1B was opened and inaugurated on the 12/3/17.

Stations

Not All are marked yet

Status Code Name Connections
Canal Transport HUB & Intercity Buses
Campus Agropolis
Expo (closed)
Maguelones Gardellia Blue/Yellow/Red Mainline
Luynes
Beaulieu
Paillade
Future Fill In Station (closed)
Gospley Central (closed)
Future Fill In Station (closed)
Future Fill In Station (closed)
Aberdeen
Palm Ridge Central Bus 11 to Ferries

NOTE: Line operated in 2 separate parts.

Phases

Phase 1: Maguelones Luynes Beaulieu

Phase 1A: Palm Ridge Central Aberdeen

Phase 1B: Expo Canal

Phase Agropolis: Addition of Campus Agropolis Station, subsequently merged with phase 1B. Hence the narrow island platform.

Phase 1 Extension: Paillade Station. The station was opened due to the construction of the Halles de La Paillade (shopping mall) nearby.