Metro Line 9 (4th Haven)

From WolvHaven Wiki
Revision as of 21:47, 20 May 2023 by Hinwapoon (talk | contribs)
Jump to navigation Jump to search

This article is about the currently under construction Metro Line 9. For the alleged conspired Metro Line 9, see Metro Line 9 (Conspired).

WolvHaven Metro Line 9 - Circular Line
MetroM.png Metro9.png
YorkM6M8Platforms.png
York Interchange
Overview
Type Rapid Transit
System WolvHaven Metro
Status      Manual. Request for a driver for service on this line. Subject to driver availability.
Termini Broadbeach
Stations 3 (Operational)
2 (Under Construction)
5 (Under Planning)
Services 1
Operation
Opened 17 July 2017; 1 year ago (Phase 1)
2019 (Phase 2)
Operator(s) ECO Railways
Character Underground (Aberdeen - Airport)
Elevated (Broadbeach)
Depot(s) Broadbeach Depot
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 750 V DC Third rail
Operating speed limit of 80km/h (50 mph)
Route Map
M9Route.png

The WolvHaven Metro line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall.


Stations

  • Broadbeach Metro5.png
  • Airport Metro10.png
  • East River Metro4.png Metro7.png