Metro Line 9 (4th Haven)

From WolvHaven Wiki
Revision as of 21:47, 20 May 2023 by Hinwapoon (talk | contribs) (Undo revision 3355 by Hinwapoon (talk))
Jump to navigation Jump to search

This article is about the currently under construction Metro Line 9. For the alleged conspired Metro Line 9, see Metro Line 9 (Conspired).

WolvHaven Metro Line 9 - Circular Line
MetroM.png Metro9.png
YorkM6M8Platforms.png
York Interchange
Overview
Type Rapid Transit
System WolvHaven Metro
Status      Manual. Request for a driver for service on this line. Subject to driver availability.
Termini Broadbeach
Stations 3 (Operational)
2 (Under Construction)
5 (Under Planning)
Services 1
Operation
Opened 17 July 2017; 1 year ago (Phase 1)
2019 (Phase 2)
Operator(s) ECO Railways
Character Underground (Aberdeen - Airport)
Elevated (Broadbeach)
Depot(s) Broadbeach Depot
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 750 V DC Third rail
Operating speed limit of 80km/h (50 mph)
Route Map
M9Route.png

The WolvHaven Metro line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall.


Stations

  • BroadbeachMetroM.png Metro5.png
  • Airport MetroM.png Metro10.png
  • East River MetroM.png Metro4.png Metro7.png