Croxley Tramlink: Difference between revisions
Transitmatt (talk | contribs) No edit summary |
Transitmatt (talk | contribs) added categories |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Construction}}{{infobox | [[Category:Croxley]] | ||
[[Category:Rail Transport]] | |||
{{Construction}} | |||
{{infobox | |||
| headerstyle = background:#55FF55; | | headerstyle = background:#55FF55; | ||
| above = Croxley Tramlink | | above = Croxley Tramlink | ||
| Line 11: | Line 14: | ||
| data6 = 27/2/21 (Initial) | | data6 = 27/2/21 (Initial) | ||
6/5/21 (Re-opening) | 6/5/21 (Re-opening) | ||
| | | label7 = Number of Stations: | ||
| data8 = | | data7= 3 | ||
| label8 = Payment Method | |||
| data8 = Croxley Card or Contactless Card | |||
| header21 = System Map | | header21 = System Map | ||
| data22 = [[File:CroxleyTramlinkMap.png|200px]] | | data22 = [[File:CroxleyTramlinkMap.png|200px]] | ||
| Line 22: | Line 27: | ||
== Rolling Stock == | == Rolling Stock == | ||
The Croxley Tramlink currently uses NS's T1 trams. It is 16 metres long by 3 | The Croxley Tramlink currently uses NS's T1 trams. It is 16 metres long by 3 metres wide. It can fit up to 60 people, both standing and sitting. | ||
{| class="wikitable" style="margin:auto;text-align:center" | |||
|- | |||
! Name | |||
!Supplier | |||
! style="width:150px; text-align:middle;" |Line | |||
!Carriages (per train) | |||
!Service commencement | |||
!Power supply | |||
!Speed Limit | |||
!Remarks | |||
|- | |||
|T1 | |||
| rowspan="2" |National Solutions | |||
|Line 1 | |||
| rowspan="2" |3 | |||
|6 May 2021 | |||
| rowspan="2" | 750 V DC ground-level and pantograph power supply | |||
| rowspan="2" |65km/h | |||
| - | |||
|- | |||
|} | |||