Bay Area Line (Gardellia Mainlines): Difference between revisions

From WolvHaven Wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{DISPLAYTITLE:Bay Area Line (Gardellia Mainlines)}}
[[Category:Gardellia]] [[Category:Gardellia Mainlines]] [[Category:Gardellia Railways]]
[[Category:Gardellia]] [[Category:Gardellia Mainlines]] [[Category:Gardellia Railways]]
{{Construction}}
{{Construction}}
Line 13: Line 12:
| data2 = Commuter Rail
| data2 = Commuter Rail
| label3 = System
| label3 = System
| data3 = [[Gardellia Mainline]]
| data3 = [[Gardellia Mainlines]]
| label4 = Status
| label4 = Status
| data4 = Operational
| data4 = Operational
Line 39: Line 38:
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| label17 = Electrification
| label17 = Electrification
| data17 = 750 V DC Third rail
| data17 = 25 kV 50 Hz AC OHLE
| label18 = Operating speed  
| label18 = Operating speed  
| data18 = 200km/h (124.2 mph)
| data18 = 144km/h (89 mph)
| header19 = Route Map
| header19 = Route Map
| data20 = -
| data20 = -

Latest revision as of 08:51, 8 April 2022

This article is under Construction.

It may be unfinished. You can help by editing this page. When this page is sufficiently long, Remove this template.

Gardellia Mainlines - Bay Area Line
 BA 

A photo of a Bay Area Line rail corridor, taken by MineShafter61
Overview
Type Commuter Rail
System Gardellia Mainlines
Status Operational
Termini -
Stations -
Services 1
Operation
Opened -
Operator(s) TransHaven
Character -
Depot(s) -
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 25 kV 50 Hz AC OHLE
Operating speed 144km/h (89 mph)
Route Map
-

The Bay Area Line is an upcoming Gardellian Mainline that is set to be open by 2021. The line will serve the bay area of Furthrat, and will navigate itself around the South Gardellian Gulf. It begins in the East, at Furthrat, and will continue further East, turning Southeast, eventually reaching and terminating at the Southeastern-most part of the South Gardellian Bay Area. Once opened, it will be the tenth Gardellian Mainline.

The Bay Area line will be coloured pink on the mainline map.