Western Peninsular Line (NMRT Pangaea): Difference between revisions
Reflected revision in plans |
m fixed typo in infobox |
||
| Line 13: | Line 13: | ||
| data4 = Under Construction | | data4 = Under Construction | ||
| label5 = Termini | | label5 = Termini | ||
| data5 = '''Stage 1:''' {{ColorBox|#2388C6|WP 9|white|border=#2388C6}} North Coast, {{ColorBox|#2388C6|WP | | data5 = '''Stage 1:''' {{ColorBox|#2388C6|WP 9|white|border=#2388C6}} North Coast, {{ColorBox|#2388C6|WP 19|white|border=#2388C6}}{{ColorBox|#F1AF15|LG 15|black|border=#F1AF15}} DEF Mines <br>'''Stage 2:''' {{ColorBox|#2388C6|WP 1|white|border=#2388C6}} Northwest Corner (future) | ||
| label6 = Stations | | label6 = Stations | ||
| data6 = 11 (Stage 1), 19 (Stage 2) | | data6 = 11 (Stage 1), 19 (Stage 2) | ||
Revision as of 16:05, 7 June 2021
| NMRT Pangaea Western Peninsular Line | |
|---|---|
| WP | |
| Overview | |
| Type | Commuter Rail |
| System | NMRT Pangaea |
| Status | Under Construction |
| Termini |
Stage 1: WP 9 North Coast, WP 19 LG 15 DEF Mines Stage 2: WP 1 Northwest Corner (future) |
| Stations | 11 (Stage 1), 19 (Stage 2) |
| Operation | |
| Opened | - |
| Operator(s) | NMRT Corporation |
| Character | Fully-underground, Semi-automatic |
| Depot(s) | None |
| Rolling stock | DEF E18 EMU (18-minecart) |
| Technical | |
| Line Length | - |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Electrification | 750 V DC Third rail |
| Operating speed | 1 bpt (72 km/h, 45 mph) |
| Formation (TrainCarts) | 18m |
| Route Map | |
The NMRT Pangaea Western Peninsular Line is a fully-underground, semi-automated train line initially running north to south along Pangaea's Western Peninsula, from which it derives its name. It is currently being built entirely in Survival Mode by defge_cd to link the vital Ragnarok Plains area located in the north of the Western Peninsula to his mines in the south. Its first stage will stretch from WP 9 North Coast to WP 19 LG 15 DEF Mines, interchanging with the KCR Tosai Line and HWP Rail Spawner Line at WP 18 T01 HWP Skeleton Spawner station and with the NMRT Pangaea Laguna Line at WP 19 LG 15 DEF Mines.
History
Construction commenced in early May 2021, when station boxes for WP 9 North Coast and WP 10 Ragnarok Plains were built along with a tunnel connecting them.
List of stations
| Station Number | Station Name | Interchange/Notes |
|---|---|---|
| WP 1 | Northwest Corner | Serves the Northwest Corner of Pangaea. Northern terminus of Stage 2. |
| WP 2 | ||
| WP 3 | ||
| WP 4 | ||
| WP 5 | ||
| WP 6 | ||
| WP 7 | ||
| WP 8 | ||
| WP 9 | North Coast | Northern terminus of Stage 1 |
| WP 10 | Ragnarok Plains | |
| WP 11 | Ragnarok South | |
| WP 12 | Sharl Leglerg | |
| WP 13 | Mimosa Heights | |
| WP 14 | Mimosa Village | |
| WP 15 | West Jungle | |
| WP 16 | West Jungle Gateway | |
| WP 17 | Portal | Named after the non-functional nether portal in the area. |
| WP 18 T01 HWP | Skeleton Spawner | Interchange station with the KCR Tosai Line and the HWP Rail Spawner Line |
| WP 19 LG 15 | DEF Mines | Interchange station with the Laguna Line |