Metro Line 9 (4th Haven): Difference between revisions
Jump to navigation
Jump to search
SilverWolv (talk | contribs) mNo edit summary |
Transitmatt (talk | contribs) No edit summary |
||
| Line 12: | Line 12: | ||
| data2 = Rapid Transit | | data2 = Rapid Transit | ||
| label3 = System | | label3 = System | ||
| data3 = [[WolvHaven Metro]] | | data3 = [[WolvHaven Metro (4th Haven)|WolvHaven Metro]] | ||
| label4 = Status | | label4 = Status | ||
| data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | | data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | ||
| Line 45: | Line 45: | ||
}} | }} | ||
The [[WolvHaven Metro]] line 9 is a proposed metro line. It is currently under construction and is an express service from [[Broadbeach (WolvHaven Metro)|Broadbeach]] to [[East River (WolvHaven Metro)|East River]]. In the future it will eventually terminate at [[City Hall (WolvHaven Metro)|City Hall]]. | The [[WolvHaven Metro (4th Haven)|WolvHaven Metro]] line 9 is a proposed metro line. It is currently under construction and is an express service from [[Broadbeach (WolvHaven Metro)|Broadbeach]] to [[East River (WolvHaven Metro)|East River]]. In the future it will eventually terminate at [[City Hall (WolvHaven Metro)|City Hall]]. | ||
Revision as of 16:12, 22 May 2021
This article is about the currently under construction Metro Line 9. For the alleged conspired Metro Line 9, see Metro Line 9 (Conspired).
| WolvHaven Metro Line 9 - Circular Line | |
|---|---|
|
| |
|
York Interchange | |
| Overview | |
| Type | Rapid Transit |
| System | WolvHaven Metro |
| Status | Manual. Request for a driver for service on this line. Subject to driver availability. |
| Termini | Broadbeach |
| Stations |
3 (Operational) 2 (Under Construction) 5 (Under Planning) |
| Services | 1 |
| Operation | |
| Opened |
17 July 2017; 1 year ago (Phase 1) 2019 (Phase 2) |
| Operator(s) | ECO Railways |
| Character |
Underground (Aberdeen - Airport) Elevated (Broadbeach) |
| Depot(s) | Broadbeach Depot |
| Rolling stock | - |
| Technical | |
| Line Length | - |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Electrification | 750 V DC Third rail |
| Operating speed | limit of 80km/h (50 mph) |
| Route Map | |
|
| |
The WolvHaven Metro line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall.
Stations
| |||||||||||||||||||||||||||||||||||||||||