Expo Line (Gardellia Mainlines): Difference between revisions

From WolvHaven Wiki
Jump to navigation Jump to search
Hinwapoon (talk | contribs)
m 1 revision imported
No edit summary
Line 5: Line 5:
| above = Gardellia Mainlines - Expo Line
| above = Gardellia Mainlines - Expo Line
| above2 = {{ColorBox|#7D7D7D|EX|white}}
| above2 = {{ColorBox|#7D7D7D|EX|white}}
| image = [[File:MainlineLogo.jpeg|50px]] [[File:MainlineBY.jpeg|80px]]
| image = {{ColorBox|#7D7D7D|'''XP'''|white|border=#7D7D7D}}
| image2 = [[File:GardMainlinePhoto.jpeg|300px]]
| image2 = [[File:GardMainlinePhoto.jpeg|300px]]
| caption2 = A photo of an Expo Line rail corridor, taken by MineShafter61
| caption2 = A photo of an Expo Line rail corridor, taken by MineShafter61

Revision as of 17:26, 18 April 2021

This article is under Construction.

It may be unfinished. You can help by editing this page. When this page is sufficiently long, Remove this template.

Gardellia Mainlines - Expo Line
 XP 

A photo of an Expo Line rail corridor, taken by MineShafter61
Overview
Type Commuter Rail
System Gardellia Mainline
Status Operational
Termini -
Stations -
Services 1
Operation
Opened -
Operator(s) TransHaven
Character -
Depot(s) -
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 750 V DC Third rail
Operating speed 200km/h (124.2 mph)
Route Map
-

The Expo Line is an upcoming Gardellian Mainline that is set to be open by 2020. The line will serve as a gateway to the Gardellia Expo, granting easy access to commuters coming from Commonwealth, or the upcoming One-North Line. Once opened, it will be the ninth Gardellian Mainline.

The Expo line will be coloured grey on the mainline map.