Expo Line (Gardellia Mainlines): Difference between revisions

From WolvHaven Wiki
Jump to navigation Jump to search
No edit summary
Tags: Mobile edit Mobile web edit
mNo edit summary
Line 38: Line 38:
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| label17 = Electrification
| label17 = Electrification
| data17 = 25 kV AC 50 Hz OHLE
| data17 = 25 kV 50 Hz AC OHLE
| label18 = Operating speed  
| label18 = Operating speed  
| data18 = 200km/h (124.2 mph)
| data18 = 200km/h (124.2 mph)

Revision as of 05:08, 16 June 2021

This article is under Construction.

It may be unfinished. You can help by editing this page. When this page is sufficiently long, Remove this template.

Gardellia Mainlines - Expo Line
 XP 

A photo of an Expo Line rail corridor, taken by MineShafter61
Overview
Type Commuter Rail
System Gardellia Mainline
Status Operational
Termini -
Stations -
Services 1
Operation
Opened -
Operator(s) TransHaven
Character -
Depot(s) -
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 25 kV 50 Hz AC OHLE
Operating speed 200km/h (124.2 mph)
Route Map
-

The Expo Line is an upcoming Gardellian Mainline that is set to be open by 2020. The line will serve as a gateway to the Gardellia Expo, granting easy access to commuters coming from Commonwealth, or the upcoming One-North Line. Once opened, it will be the ninth Gardellian Mainline.

The Expo line will be coloured grey on the mainline map.