ConnectCentral: Difference between revisions
m →2021 Revitalization Plans: Add |
→Lines: update |
||
| Line 114: | Line 114: | ||
|Canal | |Canal | ||
|{{ColorBox|Red|'''A'''|white|border=white}} | |{{ColorBox|Red|'''A'''|white|border=white}} | ||
|Paillade Stadium | |Paillade Stadium (Under Construction) | ||
|- | |- | ||
|Castelnau Le Lez | |Castelnau Le Lez | ||
| Line 179: | Line 179: | ||
|- | |- | ||
|Gospley | |Gospley | ||
| | |Fellindre | ||
| | | | ||
|Under Construction | |Under Construction | ||
| Line 191: | Line 191: | ||
|Palm Ridge Central | |Palm Ridge Central | ||
|{{ColorBox|DarkBlue|'''E'''|white|border=white}} | |{{ColorBox|DarkBlue|'''E'''|white|border=white}} | ||
|Palm Ridge Mainline | |Palm Ridge Mainline, Buses to Ferries | ||
|- | |- | ||
|Palm Ridge | |Palm Ridge | ||
| Line 210: | Line 210: | ||
|Traxia | |Traxia | ||
|Traxia | |Traxia | ||
|{{ColorBox|Cyan|'''Traxia Connector Line'''|black|border=white}} | |||
| | | | ||
|- | |- | ||
|} | |} | ||
Revision as of 20:37, 10 July 2021
| ConnectCentral | |
|---|---|
| Error creating thumbnail: Unable to save thumbnail to destination | |
| Public Transport System | |
| Operators: | Connect and Dalesburg Department of Transportation |
| Lines: | 5 ( A B D E U , formerly C ) |
| Number of Stations: | 31 |
| Parent Company | Matt Transit and Dalesburg Department of Transportation |
| System Map | |
|
| |
The ConnectCentral network is a five-line tramway system in the cities of Castelnau Le Lez, Gospley, Palm Ridge, Dalesburg and Rockham located in the Central Region of Gardellia. The tramway is owned by the five cities' transport agencies, and is also operated by all five of their transport agencies.
History
ConnectCentral is a rebranding of the Dalesburg Tram lines that extended into Castelnau Le Lez. A line was later extended into Rockham.
Over the years, lots of improvements were done including platform extensions and frequency improvements. Due to the regeneration of Rockham, Line C was permanently closed. Line A lost its branch to Residential due to low usage. Its replacement station is ConnectCentral Arena.
Line D opened in two separate regions due to the complexity of connections to be done. These sections were Paillade to Maguelones in Castelnau Le Lez and Aberdeen to Central in Palm Ridge. The latter was extended to North New Oak in 2020. This line had served the Canal section until 2020 when Line A took over.
Line A Improvement works
Over the years, Line A has received multiple track improvement works. The curves around Dalesburg City Hall were redone when platform extension works occurred. As existing tunnels leading to Maguelones from Castelnau Arena were too sharp, a new route was done to allow for longer trains to operate. This renovation was completed in 2020, utilising a month-long closure. When the underground road tunnel was redone, a new route was needed between north of the new Maguelones portal and west of Dalesburg City Hall. A new gentle curve was done from the latter, with a new cut-and-cover tunnel dug. The line now has a road crossing due to space constraints. These works were completed in May 2021. Castelnau Arena would open at a later date due to extensive renovation involving the Castelnau Underground station.
Separation and Realignment of Lines A and B, Extension to Central City
Due to overcrowding, ConnectCentral considered several solutions to mitigate this issue. To increase capacity, Line B would be separated entirely from Line A, with direct tunnels to reach Paillade Stadium. Whilst this was done, Line A was realigned between Maguelones and Canal to enable the project to revitalise Castelnau Canal be delivered. Agropolis tramstop was permanently closed, and Canal tramstop was relocated slightly to the east. This location would be connected to the Line B tramstop.
Line B would take an alternative route to Canal, via Paillade, providing interchange to Tram Line D. It was first separated from Line A in March 2020. Current works progressed up to Paillade, which was completed on 13 October 2020. New tunnels were dug to Canal in May 2021, expected to open in July. On the other end, Dalesburg Mainline station ceased to be the terminus when the line was extended to Dalesburg Athlete Village.
These lines are expected to be extended to Central City. Tentative dates are not set, but the alignments were finalised in 2020. Line B would continue from Canal to the Port of Gardellia, while Line A would continue from LeCity2 into the Central City, with an intersection with Line B at the western end. Preliminary works were done on Line A, which saw the total reconstruction of Super Speedway station and the short extension to LeCity2. Allentown station was relocated, with Dalesburg City Hall rebuilt to accommodate longer platforms and an additional pair for Line B. With several weekend closures, these works were completed in 2020.
2021 Revitalization Plans
Things to add:
- Line D Gospley section completion
- Reconstruction of Aberdeen
- Line D extension to Traxia
- Line E extensions to Ember Coast and New Hudson, tunnel adjustment, track realignments
- Castelnau Underground integrated as Line U
- quick note: more condensed for Line D part, more history in the separate article itself
Lines
A Red Line
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Castelnau Le Lez | Canal | B | |
| Castelnau Le Lez | Maguelones | D U NE NW CP IS NC | |
| Castelnau Le Lez | Castelnau Arena | U | Temporarily Closed |
| Dalesburg | City Hall | B | |
| Dalesburg | Allentown | ||
| Dalesburg | ConnectCentral Arena | ConnectCentral Arena | |
| Dalesburg | Super Speedway | Dalesburg Speedway APM | Dalesburg Speedway |
| Gardellia Central City | lecity2 | lecity2 Mall |
Up to every 4 minutes during the day.
B Orange Line
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Castelnau Le Lez | Canal | A | Paillade Stadium (Under Construction) |
| Castelnau Le Lez | Paillade | D | |
| Dalesburg | City Hall | A | |
| Dalesburg | Train Station | NE | |
| Dalesburg | Ocean Key | ||
| Dalesburg | Athlete Village West |
Up to every 5 minutes during the day.
D Cyan Line For more information and history see Matt Transit Castelnau Le Lez - Palm Ridge Line
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Castelnau Le Lez | Maguelones | A U NE NW CP IS NC | |
| Castelnau Le Lez | Beaulieu | Beaulieu Peak | |
| Castelnau Le Lez | Paillade | B At Paillade Nord Station U | |
| Gospley | Gospley Central | NW CP IS NC | |
| Gospley | Bridesgate | ||
| Gospley | Fellindre | Under Construction | |
| Palm Ridge | Aberdeen | ||
| Palm Ridge | Palm Ridge Central | E | Palm Ridge Mainline, Buses to Ferries |
| Palm Ridge | Westlands | ||
| New Oak | New Oak Riverpark | At New Oak Station NW NC New Oak Tram | |
| New Oak | North New Oak | New Oak Tram | |
| Traxia | Traxia | Traxia Connector Line |
Up to every 3 minutes during the day.
E Blue Line
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Palm Ridge | Plainsview | ||
| Palm Ridge | Mainline | NW IS NC COACH to Cranbrook | |
| Palm Ridge | Palm Ridge Central | D | |
| Stadium Branch | |||
| Palm Ridge | Stadium | ||
| Ember Coast Branch | |||
| Palm Ridge | Forum | Palm Ridge Temple-Arena | |
| Palm Ridge | Connor | ||
| Ember Coast | Mainline | IS | Under Construction |
Up to every 6 minutes during the day. Service will be boosted once the line is extended to Ember Coast with a 3+1 service pattern (3 trains for Ember Coast for every 1 train to Stadium)
U Castelnau Underground For more information and history see Castelnau Underground
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Castelnau Le Lez | Seaside Central | ||
| Castelnau Le Lez | Beach | ||
| Castelnau Le Lez | Paillade Nord | ||
| Castelnau Le Lez | Castelnau Arena | A | Temporarily Closed |
| Castelnau Le Lez | Maguelones | A D NE NW CP IS NC | |
| Castelnau Le Lez | Soho Park | ||
| Castelnau Le Lez | Lez Riverside |
Up to every 3.8 minutes during the day.
Defunct Lines
C Green Line
| City | Station Name | Interchange | Notes |
|---|---|---|---|
| Dalesburg | Residential | A | |
| Rockham | East Beach | ||
| Rockham | Central | ||
| Rockham | Southpoint | ||
| Rockham | Stadium Way |
Trivia
Tram Line A serves 3 stadiums, the ConnectCentral Arena, Paillade Stadium and Castelnau Arena.
Service Notifications
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||