WolvHaven Metro (5th Haven): Difference between revisions
MatthieuTofu (talk | contribs) added Modified Initial System Map |
SilverWolv (talk | contribs) No edit summary |
||
| Line 52: | Line 52: | ||
==== Modified Initial System ==== | ==== Modified Initial System ==== | ||
[[File:5H Metro Modified Initial System.png|left|thumb]] | [[File:5H Metro Modified Initial System.png|left|thumb]]In line with [[Vision 2023]], the new metro system was a key component in getting [[New Wolfminster (5th Haven)]] ready for use by 2023. An initial system comprising of all of the stations in the City Loop and a short portion of the T3 East-West Line was marked for completion by the end of 2022 to allow for a basic metro system to serve the city when it takes over as the main world of the server. | ||
[[File:5thHavenOriginalMapPlans.png|thumb|Original Metro Plans on the old island map layout prior to the re-worldpainting of New Wolfminster]] | |||
Much progress was made, with many of they key pieces of infrastructure being completed. However, due to the speed of progress, it was evident that the original initial system may not be completed in time by 2023, due to the slow construction work on the eastern train junction of the loop. | |||
The modified initial system was proposed to enable construction works to be focused on getting the system ready for operation by 2023. This system would include all of the stations in the city loop, however with the service not operating in a looping manner due to the delays in construction of the Eastern rail junction.[[File:5thHavenOriginalMapPlans.png|thumb|Original Metro Plans on the old island map layout prior to the re-worldpainting of New Wolfminster]] | |||
== Network & Infrastructure == | == Network & Infrastructure == | ||