Metro Line 9 (4th Haven): Difference between revisions

From WolvHaven Wiki
Jump to navigation Jump to search
Hinwapoon (talk | contribs)
m Hinwapoon moved page Metro Line 9 to Metro Line 9 (4th Haven)
mNo edit summary
Line 1: Line 1:
[[Category:WolvHaven Metro (2014-2017)]]
[[Category:WolvHaven Metro (4th Haven)]][[Category:4th Haven]]
''This article is about the currently under construction Metro Line 9. For the alleged conspired  Metro Line 9, see [[Metro Line 9 (Conspired)]].
''This article is about the currently under construction Metro Line 9. For the alleged conspired  Metro Line 9, see [[Metro Line 9 (Conspired)]].



Revision as of 07:15, 17 April 2021

This article is about the currently under construction Metro Line 9. For the alleged conspired Metro Line 9, see Metro Line 9 (Conspired).

WolvHaven Metro Line 9 - Circular Line

York Interchange
Overview
Type Rapid Transit
System WolvHaven Metro
Status      Manual. Request for a driver for service on this line. Subject to driver availability.
Termini Broadbeach
Stations 3 (Operational)
2 (Under Construction)
5 (Under Planning)
Services 1
Operation
Opened 17 July 2017; 1 year ago (Phase 1)
2019 (Phase 2)
Operator(s) ECO Railways
Character Underground (Aberdeen - Airport)
Elevated (Broadbeach)
Depot(s) Broadbeach Depot
Rolling stock -
Technical
Line Length -
Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 750 V DC Third rail
Operating speed limit of 80km/h (50 mph)
Route Map

The WolvHaven Metro line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall.


Stations