WolvHaven Metro (5th Haven)

From WolvHaven Wiki
Revision as of 06:21, 30 August 2022 by SilverWolv (talk | contribs) (Created page with "{{Construction}} {{infobox | headerstyle = background:#7F0000; color:white; width:100%; | above = WolvHaven Metro | image = 75px | header1 = Overview | lab...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
This article is under Construction.

It may be unfinished. You can help by editing this page. When this page is sufficiently long, Remove this template.

WolvHaven Metro
Overview
Owner Transport for WolvHaven
Locale New Wolfminster (5th Haven)
Transit type Rapid transit
Number of lines: 4 (4 in construction)
Number of stations 10
Operation
Began operation 2023 (expected)
Operator(s) SMRT
Technical
System length 13.1km (8.14mi)
Track gauge 1,435 mm (4 ft 8 1⁄2 in); standard gauge
Lines

T1 Wolfminster

T2 Decennial

T3 East-West

T4 Brookedge
System Map
No Map Yet

The WolvHaven Metropolitan Train Network (WolvHaven Metro) is a rapid transit system serving New Wolfminster. The system serves 10 stations along four routes on 13.1km of track. The system is owned by Transport for WolvHaven and is operated by the Société Métropolitaine et Régionale des Transports (SMRT). The initial system is scheduled to open in stages from 2023.

History

Network & Infrastructure

Services

Rolling Stock