Platform Screen Doors: Difference between revisions

mNo edit summary
mNo edit summary
 
Line 72: Line 72:
=== CB1 Command-Block Based (2018) ===
=== CB1 Command-Block Based (2018) ===
Command block based PSDs are also present where command blocks replace the doors with air and back with the doors again. This was introduced by [[User:Starcubed|Starcubed]] and the doors are implemented on at Stadium and Waterloo stations of the [[WolvHaven Metro (4th Haven)]]. The footprint of such doors is large as schematics of the doors being closed and open had to be stored above/under the platform for the command blocks to copy them from.
Command block based PSDs are also present where command blocks replace the doors with air and back with the doors again. This was introduced by [[User:Starcubed|Starcubed]] and the doors are implemented on at Stadium and Waterloo stations of the [[WolvHaven Metro (4th Haven)]]. The footprint of such doors is large as schematics of the doors being closed and open had to be stored above/under the platform for the command blocks to copy them from.
{{Template:MetroNavbox}}