Expo Line (Gardellia Mainlines): Difference between revisions

m SilverWolv moved page Gardellia Mainlines Expo Line to Expo Line (Gardellia Mainlines) without leaving a redirect
mNo edit summary
 
(3 intermediate revisions by one other user not shown)
Line 12: Line 12:
| data2 = Commuter Rail
| data2 = Commuter Rail
| label3 = System
| label3 = System
| data3 = [[Gardellia Mainline]]
| data3 = [[Gardellia Mainlines]]
| label4 = Status
| label4 = Status
| data4 = Operational
| data4 = Operational
Line 38: Line 38:
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| data16 = 1,435 mm (4 ft 8 1⁄2 in) standard gauge
| label17 = Electrification
| label17 = Electrification
| data17 = 750 V DC Third rail
| data17 = 25 kV 50 Hz AC OHLE
| label18 = Operating speed  
| label18 = Operating speed  
| data18 = 200km/h (124.2 mph)
| data18 = 144km/h (89 mph)
| header19 = Route Map
| header19 = Route Map
| data20 = -
| data20 = -
}}
}}


The '''Expo Line''' is an upcoming [[Gardellia Mainlines|Gardellian Mainline]] that is set to be open by 2020. The line will serve as a gateway to the Gardellia Expo, granting easy access to commuters coming from Commonwealth, or the upcoming [[Gardellia Mainlines One-North Line|One-North Line]]. Once opened, it will be the ninth Gardellian Mainline.
The '''Expo Line''' is an upcoming [[Gardellia Mainlines|Gardellian Mainline]] that is set to be open by 2020. The line will serve as a gateway to the Gardellia Expo, granting easy access to commuters coming from Commonwealth, or the upcoming [[One-North Line (Gardellia Mainlines)|One-North Line]]. Once opened, it will be the ninth Gardellian Mainline.


The Expo line will be coloured grey on the mainline map.
The Expo line will be coloured grey on the mainline map.