KCR Tozai Line: Difference between revisions

KC0072015 (talk | contribs)
m Updated Line Maps
KC0072015 (talk | contribs)
Adding Tozai Line Phase 2 development information
 
(One intermediate revision by one other user not shown)
Line 63: Line 63:
}}
}}


The '''KCR Tozai Line''' is a rapid mass transit line in Pangaea, WolvHaven, owned and operated by KCR. When completed, the line will run between Iceland in east Pangaea and West Peninsula International Airport station (formerly known as Skeleton Spawner station) in west Pangaea. As of 2021, the line is 6.3 km long, the longest of all public rail lines in Pangaea (2021). The Tozai Line is colored KCR Blue on maps, diagrams and signboards. Its station codes are prefixed with "T".
The '''KCR Tozai Line''' is a rapid mass transit line in Pangaea, WolvHaven, owned and operated by KCR. When completed, the line will run between Iceland in east Pangaea and Western Peninsula International Airport station (formerly known as Skeleton Spawner station) in west Pangaea. As of 2021, the line is 6.3 km long, the longest of all public rail lines in Pangaea (2021). The Tozai Line is colored KCR Blue on maps, diagrams and signboards. Its station codes are prefixed with "T".


==Overview==
==Overview==
Line 102: Line 102:
=== Renovation and conversion to 2-lane operation ===
=== Renovation and conversion to 2-lane operation ===
In 2021, KCR began renovating the entire length of the Tozai Line, realigning some sections, rebuilding stations, replacing the old 14-car E140 Series with the higher-capacity E200 Series train, and crucially converting to a 2-lane railway in response to commuter complaints.
In 2021, KCR began renovating the entire length of the Tozai Line, realigning some sections, rebuilding stations, replacing the old 14-car E140 Series with the higher-capacity E200 Series train, and crucially converting to a 2-lane railway in response to commuter complaints.
=== Phase 2 ===
In summer 2021, KCR began extending Tozai Line from Spawn N to Iceland, adding 2 new station, Nakahigashi Machi and terminus Iceland. The construction is ended in 1st September. On top of that, Next Train Information Board is installed in all KCR stations.
==List of stations==
==List of stations==
*Local trains stop at every station. Rapid trains stop at stations marked "●" and do not stop at those marked "|".
*Local trains stop at every station. Rapid trains stop at stations marked "●" and do not stop at those marked "|".
Line 134: Line 138:
|A & A Railway
|A & A Railway
|-
|-
|{{ColorBox|#009bbf|T05|white|border=#009bbf}}
|Nakahigashi Machi
! style="width:10%; background:#dacffc; color:black" ||
|
|-
|{{ColorBox|#009bbf|T06|white|border=#009bbf}}
|Iceland
! style="width:10%; background:#dacffc; color:black" |●
|NMRT
|-


|}
|}