KCR Tozai Line: Difference between revisions

Defgecd (talk | contribs)
WPIA tweaks (Attempt 2)
KC0072015 (talk | contribs)
Adding Tozai Line Phase 2 development information
 
Line 102: Line 102:
=== Renovation and conversion to 2-lane operation ===
=== Renovation and conversion to 2-lane operation ===
In 2021, KCR began renovating the entire length of the Tozai Line, realigning some sections, rebuilding stations, replacing the old 14-car E140 Series with the higher-capacity E200 Series train, and crucially converting to a 2-lane railway in response to commuter complaints.
In 2021, KCR began renovating the entire length of the Tozai Line, realigning some sections, rebuilding stations, replacing the old 14-car E140 Series with the higher-capacity E200 Series train, and crucially converting to a 2-lane railway in response to commuter complaints.
=== Phase 2 ===
In summer 2021, KCR began extending Tozai Line from Spawn N to Iceland, adding 2 new station, Nakahigashi Machi and terminus Iceland. The construction is ended in 1st September. On top of that, Next Train Information Board is installed in all KCR stations.
==List of stations==
==List of stations==
*Local trains stop at every station. Rapid trains stop at stations marked "●" and do not stop at those marked "|".
*Local trains stop at every station. Rapid trains stop at stations marked "●" and do not stop at those marked "|".
Line 134: Line 138:
|A & A Railway
|A & A Railway
|-
|-
|{{ColorBox|#009bbf|T05|white|border=#009bbf}}
|Nakahigashi Machi
! style="width:10%; background:#dacffc; color:black" ||
|
|-
|{{ColorBox|#009bbf|T06|white|border=#009bbf}}
|Iceland
! style="width:10%; background:#dacffc; color:black" |●
|NMRT
|-


|}
|}