Metro Line 9 (4th Haven): Difference between revisions
Jump to navigation
Jump to search
Transitmatt (talk | contribs) No edit summary |
MatthieuTofu (talk | contribs) mNo edit summary |
||
| Line 7: | Line 7: | ||
| image = [[File:MetroM.png|50px]] [[File:Metro9.png|50px]] | | image = [[File:MetroM.png|50px]] [[File:Metro9.png|50px]] | ||
| image2 = [[File:YorkM6M8Platforms.png|300px]] | | image2 = [[File:YorkM6M8Platforms.png|300px]] | ||
| caption2 = | | caption2 = York Interchange | ||
| header1 = Overview | | header1 = Overview | ||
| label2 = Type | | label2 = Type | ||
| Line 16: | Line 16: | ||
| data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | | data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | ||
| label5 = Termini | | label5 = Termini | ||
| data5 = | | data5 = Broadbeach | ||
| label6 = Stations | | label6 = Stations | ||
| data6 = 3 (Operational) <br /> 2 (Under Construction) <br /> 5 (Under Planning) | | data6 = 3 (Operational) <br /> 2 (Under Construction) <br /> 5 (Under Planning) | ||
| Line 25: | Line 25: | ||
| data9 = 17 July 2017; 1 year ago (Phase 1) <br /> 2019 (Phase 2) | | data9 = 17 July 2017; 1 year ago (Phase 1) <br /> 2019 (Phase 2) | ||
| label10 = Operator(s) | | label10 = Operator(s) | ||
| data10 = | | data10 = ECO Railways | ||
| label11 = Character | | label11 = Character | ||
| data11 = Underground ( | | data11 = Underground (Aberdeen - Airport) <br /> Elevated (Broadbeach) | ||
| label12 = Depot(s) | | label12 = Depot(s) | ||
| data12 = | | data12 = Broadbeach Depot | ||
| label13 = Rolling stock | | label13 = Rolling stock | ||
| data13 = - | | data13 = - | ||
| Line 45: | Line 45: | ||
}} | }} | ||
The [[WolvHaven Metro (4th Haven)|WolvHaven Metro]] line 9 is a proposed metro line. It is currently under construction and is an express service from | The [[WolvHaven Metro (4th Haven)|WolvHaven Metro]] line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall. | ||
==Stations== | ==Stations== | ||
* ''' | * '''Broadbeach'''[[File:MetroM.png|25px]] [[File:Metro5.png|25px]] | ||
* ''' | * ''' Airport''' [[File:MetroM.png|25px]] [[File:Metro10.png|25px]] | ||
* ''' | * ''' East River''' [[File:MetroM.png|25px]] [[File:Metro4.png|25px]] [[File:Metro7.png|25px]] | ||
{{MetroNavbox}} | {{MetroNavbox}} | ||
Revision as of 08:44, 8 April 2022
This article is about the currently under construction Metro Line 9. For the alleged conspired Metro Line 9, see Metro Line 9 (Conspired).
| WolvHaven Metro Line 9 - Circular Line | |
|---|---|
|
| |
|
York Interchange | |
| Overview | |
| Type | Rapid Transit |
| System | WolvHaven Metro |
| Status | Manual. Request for a driver for service on this line. Subject to driver availability. |
| Termini | Broadbeach |
| Stations |
3 (Operational) 2 (Under Construction) 5 (Under Planning) |
| Services | 1 |
| Operation | |
| Opened |
17 July 2017; 1 year ago (Phase 1) 2019 (Phase 2) |
| Operator(s) | ECO Railways |
| Character |
Underground (Aberdeen - Airport) Elevated (Broadbeach) |
| Depot(s) | Broadbeach Depot |
| Rolling stock | - |
| Technical | |
| Line Length | - |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Electrification | 750 V DC Third rail |
| Operating speed | limit of 80km/h (50 mph) |
| Route Map | |
|
| |
The WolvHaven Metro line 9 is a proposed metro line. It is currently under construction and is an express service from Broadbeach to East River. In the future it will eventually terminate at City Hall.
Stations
| |||||||||||||||||||||||||||||||||||||||||