2022 plans
Line 107: Line 107:


- Line E extension (Late-Aug 2021 to Palm Ridge - Beverly)
- Line E extension (Late-Aug 2021 to Palm Ridge - Beverly)
=== 2022 Network Extension programs ===
Finalised in mid-September 2022, the 2022 program included the extension of line {{ColorBox|Red|'''A'''|white|border=white}} to the Port of Gardellia whilst relocating the current alignment in Central City to a grass median. In addition the extension included a new road link between Dalesburg and Central City along with a revamped car park for the Dalesburg Super Speedway. Line {{ColorBox|Red|'''A'''|white|border=white}} and {{ColorBox|Orange|'''B'''|white|border=white}} would also be realigned in Dalesburg itself in a bid to increase speed limits and shorten travel times. As part of this project, Dalesburg City Hall and Train Station stops may be merged.
Separately, the plans to extend line {{ColorBox|DarkBlue|'''E'''|white|border=white}} north to New Hudson and south to Ember Coast and a new park and ride facility at South New Oak were shifted from the 2021 revitalization plan program.
Finally, the local Traxia Connector tram line was planned to be integrated into the '''ConnectCentral''' network and branded as line T will be lightly refurbished.


== Lines ==
== Lines ==