ConnectCentral: Difference between revisions
MatthieuTofu (talk | contribs) 2022 plans |
MatthieuTofu (talk | contribs) |
||
| Line 108: | Line 108: | ||
- Line E extension (Late-Aug 2021 to Palm Ridge - Beverly) | - Line E extension (Late-Aug 2021 to Palm Ridge - Beverly) | ||
=== 2022 Network Extension | === 2022 Network Extension program === | ||
Finalised in mid-September 2022, the 2022 program included the extension of line {{ColorBox|Red|'''A'''|white|border=white}} to the Port of Gardellia whilst relocating the current alignment in Central City to a grass median. In addition the extension included a new road link between Dalesburg and Central City along with a revamped car park for the Dalesburg Super Speedway. Line {{ColorBox|Red|'''A'''|white|border=white}} and {{ColorBox|Orange|'''B'''|white|border=white}} would also be realigned in Dalesburg itself in a bid to increase speed limits and shorten travel times. As part of this project, Dalesburg City Hall and Train Station stops may be merged. | Finalised in mid-September 2022, the 2022 program included the extension of line {{ColorBox|Red|'''A'''|white|border=white}} to the Port of Gardellia whilst relocating the current alignment in Central City to a grass median. In addition the extension included a new road link between Dalesburg and Central City along with a revamped car park for the Dalesburg Super Speedway. Line {{ColorBox|Red|'''A'''|white|border=white}} and {{ColorBox|Orange|'''B'''|white|border=white}} would also be realigned in Dalesburg itself in a bid to increase speed limits and shorten travel times. As part of this project, Dalesburg City Hall and Train Station stops may be merged. | ||