ConnectCentral: Difference between revisions

No edit summary
Line 12: Line 12:
| data5 = 5 ({{ColorBox|Red|'''A'''|white|border=red}} {{ColorBox|Orange|'''B'''|white|border=orange}} {{ColorBox|Cyan|'''D'''|white|border=cyan}} {{ColorBox|DarkBlue|'''E'''|white|border=darkblue}} {{ColorBox|Grey|'''U'''|white|border=grey}}, formerly {{ColorBox|DarkGreen|'''C'''|white|border=darkgreen}})  
| data5 = 5 ({{ColorBox|Red|'''A'''|white|border=red}} {{ColorBox|Orange|'''B'''|white|border=orange}} {{ColorBox|Cyan|'''D'''|white|border=cyan}} {{ColorBox|DarkBlue|'''E'''|white|border=darkblue}} {{ColorBox|Grey|'''U'''|white|border=grey}}, formerly {{ColorBox|DarkGreen|'''C'''|white|border=darkgreen}})  
| label8 = Number of Stations:
| label8 = Number of Stations:
| data8 = 32
| data8 = 33
| header21 = System Map
| header21 = System Map
| data22 = [[File:ConnectCentralRealMap.png|600px]] ‎
| data22 = [[File:ConnectCentralRealMap.png|600px]] ‎
Line 105: Line 105:


- Line E extensions to Ember Coast and New Hudson, tunnel adjustment, track realignments
- Line E extensions to Ember Coast and New Hudson, tunnel adjustment, track realignments
- Line E extension (Late-Aug 2021 to Palm Ridge - Beverly)


=== 2022 Network Extension program ===
=== 2022 Network Extension program ===
Line 114: Line 112:


Finally, the local Traxia Connector tram line was planned to be integrated into the '''ConnectCentral''' network and branded as line T will be lightly refurbished.
Finally, the local Traxia Connector tram line was planned to be integrated into the '''ConnectCentral''' network and branded as line T will be lightly refurbished.
==== Line E extension to Beverly ====
Whilst construction had mostly been completed on the one station extension bringing line {{ColorBox|DarkBlue|'''E'''|white|border=white}} further north in August 2021, the station only opened on September 14th 2022.


== Lines ==
== Lines ==
Line 317: Line 318:
|Beverly
|Beverly
|
|
|Under Construction
|
|-
|-
|Palm Ridge
|Palm Ridge