Metro Line 4 (4th Haven): Difference between revisions
Jump to navigation
Jump to search
SilverWolv (talk | contribs) m Update categories |
Transitmatt (talk | contribs) No edit summary |
||
| Line 10: | Line 10: | ||
| data2 = Rapid Transit | | data2 = Rapid Transit | ||
| label3 = System | | label3 = System | ||
| data3 = [[WolvHaven Metro]] | | data3 = [[WolvHaven Metro (4th Haven)|WolvHaven Metro]] | ||
| label4 = Status | | label4 = Status | ||
| data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | | data4 = {{ColorBox|Orange}} Manual. Request for a driver for service on this line. Subject to driver availability. | ||
| Line 44: | Line 44: | ||
The '''[[WolvHaven Metro]] Line 4''' is a metro line running along the central side of the city's Wolfminster island. | The '''[[WolvHaven Metro (4th Haven)|WolvHaven Metro]] Line 4''' is a metro line running along the central side of the city's Wolfminster island. | ||
== Stations == | == Stations == | ||
Revision as of 20:09, 12 May 2021
| WolvHaven Metro Line 4 | |
|---|---|
|
| |
|
York Interchange | |
| Overview | |
| Type | Rapid Transit |
| System | WolvHaven Metro |
| Status | Manual. Request for a driver for service on this line. Subject to driver availability. |
| Termini |
York City Hall |
| Stations | 9 (Operational) |
| Services | 1 |
| Operation | |
| Opened | October 2014; 3 years ago |
| Operator(s) | Sakana Heavy Industrial Transit ( lorem ipsum corporation) |
| Character | Underground (City Hall - York) |
| Depot(s) | York |
| Rolling Stock |
SM25A SM25B |
| Technical | |
| Line Length | 3.2km (1.92m) |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
| Electrification | 750 V DC Third rail |
| Operating speed | limit of 65 km/h (40 mph) |
| Route Map | |
|
| |
The WolvHaven Metro Line 4 is a metro line running along the central side of the city's Wolfminster island.
Stations
W O L F M I N S T E R
W O L F M I N S T E R
M E C H A N I C S B U R G
M E C H A N I C S B U R G
Mechanicsburg-York Extension
In October 2017, plans were unveiled to extend Line 4 to York station to connect with lines 6, 7 and 8. Construction began in late November, 2017. The project has recently been completed. The extension goes through the following stations:
W O L F M I N S T E R
M E C H A N I C S B U R G
M E C H A N I C S B U R G
| |||||||||||||||||||||||||||||||||||||||||