WolvHaven Metro (4th Haven)

From WolvHaven Wiki
Revision as of 10:46, 31 October 2021 by SilverWolv (talk | contribs) (Network: Fix line links)
Jump to navigation Jump to search
WolvHaven Metro
Overview
Owner TransHaven
Locale WolvHaven Archipelago
Transit type Rapid transit
Number of lines: 11 ( 10 in operation, 1 under construction )
Number of stations 41 ( 36 in operation, 4 under construction, 1 disused )
Daily ridership 650 (2017)
Operation
Began operation 2 November, 2013; 4 years ago
Operator(s) TransHaven ( Department of Transportation )
Fried Transportation ( lorem ipsum corporation )
RegioLinQ
Westrans
Sakana Heavy Industrial Transportation
UKRail
Technical
System length 13.1km (8.14mi)
Track gauge 1,435 mm (4 ft 8 1⁄2 in); standard gauge
Lines
System Map

The WolvHaven Metro is a rapid transit system serving WolvHaven, covering almost every square kilometre of the city. The entire system comprises of 11 metro lines serving all 3 boroughs of the city. The first section of the Metro opened during the second quarter of 2014, and was comprised of 4 stations: Palais De Royal, City Hall, Republic, and Nation. However, with the increasing demand for public transportation and the lack of other forms of transportation, the WolvHaven Metro has expanded to 11 Metro Lines, 41 Metro Stations, and coverage on all four islands of the WolvHaven City.

The metro lines are built by the many talented architects of WolvHaven, and are overseen by the Department of Transportation, a major department of the WolvHaven Government, which also allocates operating concessions to many rail operators and/or corporations such as lorem ipsum corporation, Sakana Heavy Industrial Transit, RegioLinQ, and more. These operators maintain the train lines, pay the train drivers that drive on said lines, and may also run bus services or other rail services such as BERT, which complement the train system.

History

With the retirement of NewHaven, the third incarnation of WolvHaven, some time during the November of 2013, city planners brought up the need to have a rail-based urban transport system to help players get around the city. At the point of time, Axton was also hoping to develop the city's rail network.

Difference in Ideology and the Birth of BERT

SilverWolv wanted to shift away from building only modern-based metro networks, as seen in the past iterations of the city where most of the infrastructure was relatively simple, with little or no additional architectural value. He wanted the newly created rail network to feature multiple architectural styles across different periods of time, with references to the ornate, grand, and decorated styles similar to that of the Paris Metro, Moscow Metro, Pyongyang Metro and the Berlin U-Bahn.

At the time, however, Axton believed more in form-follows-function, opting for simpler, modern, design without the ornate details, and also preferred using iron door based platform screen doors. His descriptions of his plans for an ideal system led to disagreements between the two, and SilverWolv instead allowed a concession for the creation of a second rail network in competition with the metro network.

Initial Development

The entire metro system was developed in stages, the first being the span of track from Palais De Royal to Nation of the Metro Line 1. Opened to the public on 19th January 2014, this 2 kilometre span of track was prioritised by to be built, as the line could take many government workers to and fro important buildings such as Palais De Royal, and the City Hall.

The network now

As of 2018, TransHaven, the Department of Transportation, and many architectural companies have worked hand in hand to create over 30 kilometres of track, over 45 metro stations, and 11 metro lines.

Previous system maps

Infrastructure

Network

The following table lists the WolvHaven Metro lines that are currently operational :

Name and color Commencement Termini Length Depot Operator Control Center
Metro Line 1 19th January 2014 Palais De Royal
Mechanicsburg
5.98 kilometres (3.7mi) Palais De Royal Depot
Mechanicsburg Depot
TransHaven Department of Transportation Building
Metro Line 2 Q3 2014 City Hall
Esplanade
3 kilometres (1.86mi) Esplanade Depot
Metro Line 3 11th February 2015 Parkroyal
Esplanade
Marine View
Parkroyal Depot
Esplanade Depot
Metro Line 4 - City Hall
York
- East River Depot Sakana Heavy Industrial Transit
Metro Line 5 - City Hall
Esplanade
- Esplanade Depot Westrans
Metro Line 6 - City Hall
York
- East River Depot Fried Transportation
Metro Line 7 - - UKRail
Metro Line 8 - - Fried Transportation
Metro Line 9 7th July 2018 City Hall
Broadbeach
- Broadbeach Depot ECO Railways
Metro Line 10 10th June 2017 City Hall
Airport
- Airport Depot TransHaven
Bella Vista Shuttle - Bella Vista
City Hall
- Bella Vista Depot

System map

Error creating thumbnail: Unable to save thumbnail to destination

Facilities, Services, and Amenities

Comprising of sections of track that are elevated, underground, sub-surface, and at-grade level, the WolvHaven Metro has over 20 kilometres of track, that connect the citizens of WolvHaven to each other, whilst bringing them wonderful views during their journey. All underground metro stations built before the year 2016 are all equipped to be converted into bomb shelters, in case of a conventional aerial bomb attack. All underground stations are fully equipped to blast cool air through their state of the art air conditioning, while other sub-surface, at-grade, and elevated metro stations are equipped with air dehumidifiers, ceiling fans, and occasionally, blast fans. As a part of a campaign to bring the WolvHaven Metro to the 21st Century and beyond, USB ports and AC power plugs and sockets with international compatibility were installed in most stations. Alongside that, 3G and 4G service are available in every part of the metro system.

Every station is equipped with a first of its kind ticketing system, ticketing machines, a Passenger Service centre, LED or plasma displays that show train service information and announcements. Most metro stations have been fitted with important facilities and amenities such as male, female, and disabled restrooms, payphones, convenience stores, and automatic teller machines. Each station is usually accompanied by a bus stop.

Most metro stations built during the first era of the fourth incarnation of WolvHaven are not equipped with |step-free facilities, such as wider Metro+ faregates , ramps & tactile guidance systems for the elderly and disabled, and tactile paving, thus preventing disabled persons from having convenient access to these trains, and instead have to rely on alternate forms of transportation. Despite the controversy, the government does not intend to equip such stations with step free facilities, as the price of such rehabilitation works could cost up to billions of taxpayer money. However, as of 2018, all metro lines, with the exception of Metro Line 1, have been retrofitted with step-free access for the elderly and disabled, although works are still ongoing to provide metro stations with additional step-free facilities.

Hours of operation

The WolvHaven Metro operates 24 hours daily, with monthly maintenance checks on each line, leaving metro services shut down for a complete day, monthly. However, during moments of extremely low TPS on the server, all automatic metro lines are to be shut down, with commuters being left with three options: commuting via bus, riding the BERT, or on manual metro lines.

Rolling Stock

The following table lists the rolling stock of the network.

Name Supplier Line Cars (per train) Total no. of cars Service commencement Power supply Speed Limit <ref group="note">Speed is measured in mBP/T, which stands for micro blocks per tick.</ref> Price <ref group="note">WHD, the official fictional currency of WolvHaven, has an equal value to SGD.</ref>
PM05 Sakana Heavy Industries Metro Line 1 Metro Line 2
Metro Line 4 Metro Line 5
Metro Line 6 Metro Line 7
5 325 12th April 2014 750 V DC Third Rail 35 mBP/T WH$8,125,000.00
PM10 10 200 23rd October 2014 WH$5,000,000.00
PM20 20 720 2nd December 2014 WH$18,000,000.00
SM05 Delino Industries 5 325 23rd February 2014 WH$11,375,000.00
SM15 15 300 11th February 2015 WH$10,500,000.00
SM20 APIA Industries & Manufacturing 20 500 2nd March 2014 WH$17,500,000.00
SM25A MYST Industries & Manufacturing 25 1250 2nd March 2014 WH$46,875,000.00
PM25AM/A Anderson Group Metro Line 1
Metro Line 2
750 May 15, 2016 90 mBP/T WH$22,500,000.00
PM25BM/A 500 30th January 2017 WH$16,250,000.00
PM25CM/A 750 4th June 2018 WH$26,250,000.00
SM15A ECO Railways Metro Line 3 15 7th October 2017 WH$28,125,000.00
SM25BM/A Metro Line 4 Metro Line 5
Metro Line 6 Metro Line 7
Metro Line 8 Metro Line 9
Bella Vista Shuttle
25 May 15, 2016 WH$30,000,000.00
SM25CM/A tonyCORP 300 30th January 2017 WH$12,750,000.00
SM25DM/A World Tech Industries 625 29th July 2018 WH$28,125,000.00
SM37A Metro Line 10 37 555 10th June 2017 WH$27,750,000.00
SM30M/A Metro Line 8 30 600 15 May 2017 WH$22,500,000.00
SM30A/A 450 9 August 2018 WH$18,000,000.00
SM30BM/A 2019 WH$19,125,000.00
SM30CM/A 2020s WH$20,250,000.00

Architecture

The WolvHaven Metro is one of WolvHaven's architectural Treasures. Featuring grand, magnificent and spacious stations (such as City Hall and Palais De Royal), the WolvHaven Metro is one of the architectural achievements of the city. The design of the stations follow closely to the stations of the Pyongyang and Moscow Metro as they are grand, large, spacious and open.

City Hall Station - The "Grand Central" of Wolv Haven

Each station is different in the WolvHaven Metro. The stations are designed by SilverWolv with the help of Green_Adventurer and TheSitherin for the interiors. This gives server citizens opportunities to contribute something to the city and help out as there are usually a lack of opportunities for which users can join the project and help out.

See also


References and notes

<references group="note"/> <references group="“ref”"/>